Ahmed, C. (2021). Early cost estimation models based on multiple regression analysis for road and railway tunnel projects. Arabian Journal of Geosciences, 14(11), 972.
Bilgin, N., & Acun, S. (2024). Practical Management of Tunneling with Tunnel Boring Machines. CRC Press.
Bondyopadhyay, B. (2023). Civil engeering 101: Beginners guide for metro rail system. Bluerose Publishers PVT, 384 p.
Bruland, A. (1999). Hard rock tunnel boring advance rate and cutter wear. Ph.D Thesis, Norwegian Institute of Technology (NTNU), Trondheim, Norway.
Chapman, D., Metje, N., & Stark, A., (2017). Introduction to tunnel construction. CRC Press. 425 p.
Rostami, J., Mahmoud, S., Ehsan, A.G., & Mojtabai, N. (2013). Planning level tunnel cost estimation based on statistical analysis of historical data. Tunnelling and Underground Space Technology, 33 (1), 22-33.
Sayedi, A.R., Hamidi, JK., Monjezi, M., & Najafzadeh, M. (2015). A preliminary cost estimation for short tunnels construction using parametric method. Engeering Geology for Society and Territory, 1:461–465.
Shahriar, K., Sharifzadeh, M., & Khademi Hamidi, J. (2008). Geotechnical risk assessment based approach for rock TBM selection in difficalt conditions. Tunneling and underground space technology, 23(3), 318-325.
Munfah, N., & Nicolas, P. (2020). Why tunnels in the US cost much more than any where else in the world, TBM Tunnel Business Magazine.