1. Shahriar K., Sharifzadeh M., Khademi J., "Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions", Tunnelling and Underground Space Technology, 23 (2008) 318-325.## 2. Sharma V. M., Saxena K.R., "In-situ characterization of rocks", Taylor and Francis groups (2002). ## 3. Baecher G. B., Christian J. T., "Reliability and statistics in geotechnical engineering". USA: John Wiley & Sons (2003). ## 4. Chiu, S., "Fuzzy model identification based on cluster estimation". J. Intell, Fuzzy Syst, v. 2 (1994) 267-278. ## 5. Iran Oston Consulting Eng., "Geology and geotechnical reports on Khorramabad-Polezal freeway" (2007). ## 6. Zhang L., "Engineering properties of rocks", Elsevier geo-engineering book series, v. 4 (2005). ## 7. Moosavi S. H., Sharifezadeh M., "General Idea for Study of Rock Mass Variability Respect to Depth (Freeway Tunnels of Khorramabad–Polezal)", Journal of Engineering Geology, Vol. 3. No.1&2 (2010) 51-70. ## 8. Moosavi S. H., "Comparison of engineering rock mass properties at investigation stage to actual measured data at construction stage -applied in Khorram abad-Polezal tunnels", MSc Thesis, Amirkabir University of Technology (Tehran Polytechnic), Iran (2010). ##