Volume 2, Issue 1 (9-2007)                   2007, 2(1): 301-323 | Back to browse issues page

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Inspection of encountered water in power tunnel of Saymareh dam site, Ilam. Journal of Engineering Geology 2007; 2 (1) :301-323
URL: http://jeg.khu.ac.ir/article-1-2563-en.html
Abstract:   (4464 Views)

Saymareh dam and hydro-power plant are under construction on Saymareh River in Ravandi anticline, Ilam province. During boring the power tunnel which crosses the anticline, a large volume of water was encountered. This volume of water was not observed in the past. Considering the water quality of springs, water level of dam site piezometers, geological and hydrogeological inspections, isotope analysis, tracing experiments and water balance, it was concluded that the main portion of water is not supplied by the Ravandi anticline. The neighboring Veizenhar, Gavar and Milleh anticlines contribute to providing the main body of water. The most probable paths of water are not cross the dam reservoir and a localized conduit flow is not established in this area. Therefore, water leakage from the reservoir is not expected.

Full-Text [PDF 1596 kb]   (1952 Downloads)    
Type of Study: Case-Study | Subject: En. Geology
Received: 2016/10/5 | Accepted: 2016/10/5 | Published: 2016/10/5

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

© 2024 CC BY-NC 4.0 | Journal of Engineering Geology

Designed & Developed by : Yektaweb